Before the Migration Starts: What the Analyst Must Settle
A migration checklist for analysts: what the new process does with every case already open on switch-on day. Four cohorts, nine settlements, one case.
Numbers in this note carry source tags ([POLICY], [THREADS n=10], [MINE]). What the tags mean.
This piece stands on the returns case published on this site: damaged-delivery refunds at a mid-size online retailer, built only from public sources - a published returns policy, help centre articles, ten public complaint threads I selected myself, consumer law and a walk through the published customer journey. No client, no interviews, no access to any of the retailer's systems or records. The case never mentions a migration. Its to-be still implies one, because the new process switches on in a world where cases already exist. The cohorts, the counts and the routing below are mine [MINE].
A data migration checklist for an analyst is the list of decisions that tell the new process what to do with every case that already exists on the day it switches on: what one migrated case is, which dates it carries, which clock it gets, who owns it, and what must not fire when it is loaded. Moving records is the build team's work. If nobody takes these decisions, the loading script takes them by default.
In short
- Read every to-be line against a case born before the line existed. Lines written for new cases can misfire on old ones on the first morning.
- The returns case has four cohorts alive on switch-on day. The parked cohort, the one the case exists for, breaks the most lines.
- Of nine settlements, the case answers none on purpose. Three are answered by the letter of a criterion, and the letter produces an outcome nobody chose. Six are not written.
- The phone line stays in the to-be, so two of the questions never go away. They need a rule, not a migration step.
What does an analyst settle before a data migration?
Wikipedia's article on data migration opens with the build view: "Data migration is the process of selecting, preparing, extracting, and transforming data and permanently transferring it from one computer storage system to another." Then it names the verification that follows, "to determine whether data was accurately translated, is complete, and supports processes in the new system."
The last clause is the analyst's. Reconciled record counts prove the first two. The third can only be checked against the requirements, which were written for cases that start in the new world. So the method is one question per line: what does this line need from a case, and does an old case have it?
Which cases are alive on switch-on day?
The as-is in sections 3.1 and 3.2 gives the population. A case today "exists as an email thread and a call note. It carries a reference the customer can quote, and that reference carries no due date." Read the as-is steps for where a case can be standing when the form goes live, and four cohorts fall out.
| Cohort | Where it stands in the as-is | What it holds today | To-be lines it meets on day one |
|---|---|---|---|
| C1 Parked | Step 6b: "Cannot decide, so the case waits" | Thread, call note, reference. No owner, no due date | REQ-014/2, REQ-015/1-3 |
| C2 Waiting for photos | Steps 3 and 4: photos asked for by email, nothing assessed | Call note, a request in a thread | REQ-014/2, REQ-018/1-2, BR-04 |
| C3 Decided, item not yet back | Step 6a, then the inspection on receipt in OBS-08 | A decision, a payout in the 2 to 5 working day window [POLICY] |
REQ-017/1-3 |
| C4 Closed | Any case that reached a decision | Photographs inside email threads | REQ-016/1-3 |
C3 assumes the item comes back, which the data model piece logged as unwritten rule U4: "Must the damaged item come back at all?" None of the four cohorts has a form, so every line that reads one must be told what to read instead.
What fires the moment the parked cases are loaded?
REQ-015 criterion 1: "On breach of the 48 hour window the case is assigned to a named individual on the duty rota." Every parked case older than 48 hours by whatever date it carries is in breach on load. They all go to the rota at once, while OQ-04 is still asking whether the rota covers weekends.
Criterion 2: "The assignment writes a due date to the case: the earlier of five working days from submission (BR-07) or 24 hours from assignment." For any case submitted more than five working days before the load, the earlier of the two dates has already passed. Each parked case gets an owner and is overdue in the same second.
Criterion 3: "The customer receives one message naming the person holding the case and the date by which they will hear back." The letter of the criterion sends one message per case. If that date is the due date from criterion 2, the message names a day that has already gone.
Three lines, each correct for a new case, together produce a rota flood, a screen of overdue cases and messages dated in the past. Nobody asked the requirements about cases older than they are. Section 3.2 names the only exit a parked case has today: "The customer chases. That is the mechanism." An unsettled load replaces it with every parked case moving at once.
Why do the waiting cases reach the pre-check without photographs?
In section 3.3 the pre-check reads "order value and delivery date, BR-04 and BR-11 applied, may approve, never refuse". Photographs belong to the form ("photos attached"), and the check never looks at them. A loaded C2 case has the order record and no photographs, so by the letter of REQ-018 criterion 1 the pre-check "can approve a refund that satisfies BR-04 and BR-11 and issue it with no human involvement". Money could leave for cases whose evidence was never sent. That reading is mine [MINE], and it is why settlement S6 below exists.
The other direction is protected. If the load date lands in BR-04's report-date slot, a customer who called on day 10 appears to have reported on day 20, and REQ-018 criterion 2 passes the case to a person instead of refusing it. The date still matters: BR-04 says "the form must not tell a customer on day 15 that they have no rights", and a wrong report date manufactures that customer.
Where does the old evidence go, and whose clock does it start?
C4 meets retention. REQ-016 criterion 1: "Photographs are deleted 90 days after the case closes" [MINE, OPEN, OQ-01]. The register names no closing event (unwritten rule U5 in the data model piece). And if photographs move from email threads into the new record with the load date as their start, the migration quietly restarts their retention clock.
That question carries a veto. Row 6 of the stakeholder map gives Legal and data protection a V over retention, and says what they lose: "Nothing, if asked early. A great deal of everyone's time, if asked late." The migration plan is the earliest moment to ask it about real images, together with criterion 3: "Deletion is logged with case id and timestamp, and the log outlives the photographs."
C3 meets the goods-in reopen: REQ-017 criterion 1 lets the goods-in lead reopen a case "within five working days of receipt, from the goods-in screen". An old-world case whose item arrives after switch-on is on that screen only if it was migrated.
Does the phone line keep the migration open forever?
Martin Fowler's Strangler Fig describes gradual replacement, and its cost: "people often balk at the necessity of building transitional architecture to allow the new and legacy system to coexist, code that will go away once the modernization is complete."
The returns case keeps the old channel on purpose. Section 3.4: "The phone line. It stays", because "the phone is the only channel for anyone the form does not fit." Nothing in the case says how a phone case after go-live is recorded. Read literally, it has no form and no form timestamp, like C2. The integration piece reached the same gap from the other end: "a case that arrives without a form timestamp has no clock, and nothing says what happens then."
For the report date and the clock start, the migration is the first instance of a permanent question. Answer it as a rule for every formless case, and the migration reuses it. Answer it inside a loading script, and the phone path inherits a decision nobody reviewed.
The settlement sheet: nine decisions, and who can make them
Each row is a default the loading script would otherwise set. Routing follows the decision rights in the stakeholder map and is mine [MINE].
| # | Settlement | Lines it serves | What the case says | Routed to |
|---|---|---|---|---|
| S1 | What one migrated case is: a thread, an order or an item | REQ-014, BR-11, U1 | Not written | Finance lead, row 2 |
| S2 | Which date counts as the damage report | BR-04 | Not written. The BR-04 constraint on day 15 applies | Rule owner (OQ-03, unknown), Legal row 6 |
| S3 | What starts the 48 hour clock without a form | REQ-014/2 | Not written | Head of Customer Care, row 1 |
| S4 | The due date of a case already past five working days | REQ-015/2 | By the letter: a date in the past | Head of Customer Care, row 1 |
| S5 | Whether loading sends the assignment message | REQ-015/3 | By the letter: one message per case | Head of Customer Care, row 1 |
| S6 | Whether the pre-check runs over migrated cases | REQ-018/1 | By the letter: it may approve and issue | Head of Customer Care row 1, Finance lead row 2 |
| S7 | Whether old photographs move, and when their 90 days start | REQ-016, U5, OQ-01 | Not written | Legal, row 6 |
| S8 | Whether decided cases awaiting the item are loaded for reopen | REQ-017/1, U4 | Not written | Returns goods-in lead, row 3 |
| S9 | How a phone case gets a clock after switch-on | REQ-014/2, 3.4 | Not written | Head of Customer Care, row 1 |
Zero settled on purpose, three settled by accident, six open. Five of the nine involve the Head of Customer Care, four of them alone: one conversation, with the person the one-page summary already asks four things of by 30 April 2026.
The middle group is the dangerous one: S4, S5 and S6 look answered. Each needs one sentence saying whether the letter is meant for old cases.
Why should the inventory come before the build, not before the load?
Every migration starts by counting C1: how many, how old. The case cannot make that measurement from outside. OQ-06 asks "How many cases actually stall today, and for how long?" and section 1.6 makes it decisive: "If the queue export showed that parked cases are rare and short, this work is not worth a release slot and I would say so."
A snapshot of the parked stock answers part of OQ-06, a stock and its ages rather than a rate, and the label belongs on the number. Taken at cutover, it arrives after the build is paid for. My recommendation [MINE]: pull it in the first week of access, as OQ-06 asks, and let the migration plan reuse the export.
The settlement card, filled in for the parked cohort
| Field | Value |
|---|---|
| Cohort | C1 Parked: thread and call note, reference, no owner, no due date (3.1 step 6b, 3.2) |
| Size and age | Unknown from outside. First number from the export behind OQ-06 [OPEN, OQ-06] |
| Unit | One case per reference until S1 is decided [MINE] |
| Report date | The date of the first call in the note, never the load date [MINE] |
| Clock start | Proposed: the load moment, so no case is in breach on arrival [MINE] |
| Due date | Proposed: 24 hours from assignment only, the five working day branch suspended for loaded cases [MINE] |
| Message on load | Proposed: one message naming the owner and a date still in the future [MINE] |
| Pre-check | Proposed: not run. Loaded cases go to a person [MINE] |
| Must not fire | A message with a past date. A refund without evidence. A reversal of money paid (REQ-017/3) |
| Verified when | Every loaded case has a named owner and a running clock |
| Decided by | Head of Customer Care, row 1. Not decided [OPEN] |
| Source lines | 3.1, 3.2, REQ-014/2, REQ-015/1-3, REQ-017/3, REQ-018/1, OQ-04, OQ-06 |
Six rows are proposals marked as mine, each refusable on its own line before the script decides it.
The settlement card, blank
| Field | Value |
|---|---|
| Cohort | [Where the case stands in the as-is, and what it holds today] |
| Size and age | [The count, its source and its date, or "unknown" with the question that will answer it] |
| Unit | [What one migrated case is] |
| Report date | [Which recorded date every date-based rule reads] |
| Clock start | [The event that starts each clock for a case with no new-world start event] |
| Due date | [What the due date rule produces for this cohort, and whether that is intended] |
| Message on load | [What the customer receives, if anything, and the dates it may name] |
| Automation | [Which automated steps run over loaded cases, and which do not] |
| Must not fire | [Every action loading this cohort must never trigger] |
| Verified when | [The process check each loaded case must pass, not the record count] |
| Decided by | [Role and decision right from the stakeholder map, and the date] |
| Source lines | [Requirement, rule, observation and question ids] |
Where does this method stop?
It settles what the process does with inherited cases. Reconciling records and mapping fields belong to the build team. It also stops at the cohorts the as-is model draws: anything the queue export shows that the model does not is outside it.
The full case is at /case, the tags are explained on the method page, and checks 05, 12 and 13 of the scorecard apply to every row of the sheet: an owner and a date per open item, an owner and a limit per waiting case, a start event per clock.
Read next
Turning Acceptance Criteria Into a UAT Script
A UAT script names who acts, what they do, the result they should see and the acceptance criterion each step proves. One
BRD or SRS: What Changes When Rules Meet a System
BRD vs SRS as one test: swap the system out and see which sentences survive. Run on all 19 rule and criterion lines of o
Get the Proof Pack