How the work is actually done
No listicles, no career-change motivation. Each note takes one piece of the job, shows a finished artifact and says what a reviewer would object to.
Field notes, page 2
Gap Analysis Between Two Process Models, Line by Line
Every as-is row walked to its fate in the to-be, then every to-be line walked back. Two residual gaps, one shared verb and one step neither model draws.
Read →Cutting Scope Without Cutting the Point
Eleven cuts a published case made and four it refused, each run through one test: on release day, is the problem the work exists to fix still there?
Read →MoSCoW or WSJF: Prioritising When Everything Is a Must
Five requirements all marked Must, put through MoSCoW's own test and then scored with WSJF: what each method decides, and what it cannot see.
Read →The Feasibility Memo That Recommends Not Building It
A feasibility memo that says no, derived from a worked case: four questions, each answered from the record, and the conditions that would turn it into a yes.
Read →How Long Will the Analysis Take? An Estimate You Can Defend
Three clocks on one published case: thirteen hours of work, seven to nine hours a plan could name in advance, and twenty-eight days of calendar.
Read →A Risk Register With Owners, Dates and a Trigger
A risk register derived from artifacts I already had: eight candidates pulled out of a published case, three thrown out for having no trigger, five rows kept.
Read →Definition of Ready for a Requirement, Not a Ceremony
A definition of ready for requirements: seven conditions a stranger can check from the requirement itself, run backwards over three versions of my own register.
Read →Five Whys Stops Working at Why Number Two
When five whys does not work, and what to do instead: one incident from a published returns case, three honest why chains, three different recommendations.
Read →The Eight Questions in a First Stakeholder Interview
First stakeholder interview questions, built backwards from the six things a case assembled from public sources could not settle, and what each answer changes.
Read →Conflicting Requirements Are an Unmade Decision
Conflicting requirements are an unmade business decision. The one-page card I write instead of mediating, filled in on a 40 EUR refund threshold.
Read →Writing a Use Case: The Main Flow Is the Easy Half
The main flow of a use case writes itself. A worked returns case where the exceptions take three times the space, with the source of each one named.
Read →The Traceability Matrix That Survives a Change Request
What a traceability matrix actually is, one change request walked through it row by row in a quarter of an hour, and the questions it still cannot answer.
Read →Next in the queue: Before the Migration Starts: What the Analyst Must Settle · A Requirements Pattern Library Worth Reusing.